Asphalt Sealcoating and Crack Filling Calculators ...

has an excellent Asphalt Paint Striping Calculator. (link is external) which will calculate materials and give you an output. Asphalt Crack Filling Calculator. Crack Sealant and Filler Yield Calculator. Crack/Joint Width x Depth (inches) Feet per Gallon. Crack/Joint Width x Depth (inches) Feet per Gallon.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Pavement material calculators | GemSeal

MASTIC CALCULATOR. Calculate how many pounds of mastic material is necessary for your job based on the area of application and the type of job (i.e. crack repair or surface repair/leveling). Download the Mastic Calculator. Microsoft Excel is required.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Determination of the Voids in the Mineral Aggregate (VMA)

calculation in Subsection 3.2. The calculation for the effective specific gravity may be found in CP 56. NOTE 1: For more detailed information on VMA determination and related subjects, refer to the Asphalt Institute publication MS-4. 3.4 When hydrated lime is used in …

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Volumetrics in Asphalt Mixtures

Total asphalt content is the amount of asphalt that must be added to the mixture to produce the desired mix qualities. Effective asphalt content is the volume of asphalt not absorbed by the aggregate; the amount of asphalt that effectively forms a bonding film on the aggregate surfaces. Effective asphalt content is calculated by

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

What is the formula to figure up how much asphalt you will ...

the formula for figuring out asphalt is.. L x W x D x 110 / 9 / 2000 = tons of asphalt. Where: L = Length in feet W = Width in feet D = Depth in inches 110 = a average weight of a square foot asphalt 1 inch thick /9 = convert to square yards /2000 = convert weight to tons So.. 27707 x 3 x 110 / 9 / 2000 = 508 tons.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Formula To Calculate Asphalt | Estimate Asphalt Tonnage

Here, density of asphalt is given as 2330 Kg/m3. To find out the quantity of asphalt, the following formula will be used :-. Volume of road section x Density of asphalt = 2440 x 2330 = 5592000 Kg. To convert it into Tons, just divide it with 1000 i.e. 5592000/1000 = 5592 tons. Watch the complete demonstration online.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

How to Calculate Asphalt Tonnage - 5 Simple Steps to Follow

How to Calculate Asphalt Tonnage – 5 Simple Steps Step 1: Measure your pathway. You need to measure the path at the very beginning to determine the length, width, and depth of the area. You need to get the accurate reading for this area measurements. Because, if you get the wrong measurements, then your calculation will also be false.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

what is the formula for calculating asphalt

Asphalt calculator formula Based on the measurements you provide for required length width and thickness the calculator first works out the area and volume of the hot asphalt mix required using the below formulas: Get Price. Asphalt Calculator Asphalt Materials. Asphalt Calculator. These calculators are designed to give approximate amounts only.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

How Many Tons Are In A Square Yard Of Asphalt 2020

Standard asphalt density is 145lbs/ft3 or 2322kg/m3. The asphalt unit weight is 2243 per cubic meter. Therefore 2.4 ton of asphalt = 1 cubic meter. 1 cubic yard of hot asphalt mix weighs 2.025 tons or 4050 lbs. These measurements are an approximation and therefore when you are ordering the quantity ensure that you add more asphalt to gather for ...

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Calculator - Minnesota Asphalt Pavement Association

The ASPHALT CALCULATOR helps you to estimate the Asphalt pavement tonnage required for your job. To use the ASPHALT CALCULATOR, simply enter the width, length, and planned nominal compacted thickness of your job. Next, click on the "CALCULATE" button. The ASPHALT CALCULATOR will estimate the tons of asphalt pavement that will be required.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Volume Calculator - CSGNetwork

This calculator is designed to give the volume in both cubic feet and cubic yards, and the tons of asphalt hot mix required for the form size you have entered. The tonage calculation is specific to asphalt only. In our equations, 1 cubic yard of hot asphalt mix weighs 2.025 tons, or 4050 lbs.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Material Area Calculator - Asphalt Driveway - How To Estimate

Rectangle Asphalt Material Area Calculator. Unit: Number: Enter Length and width: Length (B) Feet. Width (A) Feet. Thickness (Depth) Inches . Calculated Results. Calculated Sq Feet. Sq Feet. Calculated Volume. Cubic Yards. Calculated Volume. Cubic Feet. Hot Mix Asphalt Required. Tons ** This estimate is based on a density of 150 lbs per cubic foot.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Calculator - How much asphalt do you need?

Asphalt Calculator These calculators are designed to give approximate amounts only. They will help you determine the quantity you need; however, variations in subgrade, compaction of subgrade, or inaccurate measurements, even a quarter of an inch, can make a difference. width feet …

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Calculator

Now that we know the volume of asphalt needed, we can determine the actual quantity of the asphalt required in terms of weight by multiplying the calculated volume with the density of the asphalt. Asphalt density ranges from 2,200 to 2,400 kg/m³ (or approximately 138 to 150 pcf). The higher the density of the asphalt, the more durable it is.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Soteksa | Asphalt Calculator

About . Asphalt calculator advanced does a really good job calculating your asphalt tonnage or concrete yards, the estimated tonnage calculated by the app uses a formula of how many square yards 1 ton of asphalt will cover, making it really accurate.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Calculator

Asphalt is a flexible pavement built in multiple layers with a continuous flow of material moving through the asphalt paver.Asphalt has low initial costs, lasts longer, and due to its recyclability, has residual value greater than other pavements.The smooth surface of asphalt provides maximum tire contact with the roadway, increasing skid resistance.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Determining Asphalt Paving Cost with an Asphalt Calculator

Our calculator takes into account the area and depth of the paving project, and calculates the necessary asphalt tonnage based on an industry standard of 148 pounds per cubic foot. Unless your paving project is a single, perfect square or rectangle, it can be challenging to produce a …

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

BULK SPECIFIC GRAVITY (G ) OF COMPACTED HOT MIX …

ASPHALT WAQTC / IDAHO AASHTO T 166 (12) T166_short_12.docx Asphalt 16-1 Pub. October 2012 BULK SPECIFIC GRAVITY (Gmb) OF COMPACTED HOT MIX ASPHALT (HMA) USING SATURATED SURFACE-DRY SPECIMENS ... should the Job Mix Formula mixing temperature be exceeded. 4. Dry to constant mass. Constant mass is defined as the mass at which further drying at the

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Tonnage Calculator App - capitalcamp

The asphalt calculator helps you to estimate the hot mix (asphalt) tonnage required for your job. Hanyu beautiful pocket calculator HY2229 pocketcalculator Asphalt calculator advanced does a really good job calculating your asphalt tonnage or concrete yards, the estimated tonnage calculated by the app uses a formula of how many square yards 1 ...

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

ASPHALT TONNAGE CALCULATOR

ASPHALT TONNAGE CALCULATOR. With Moody Insurance, you always have access to local experts who specialize in Construction services to ensure that you, your employees and your assets are protected. Click here or on the image to the below to Visit the Moody Insurance Agency Site. MIKE GEPPNER, CRM, CIC - 303.824.6623 - E-Mail to Mike Geppner.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Calculator - Asphalt Driveway Cost Calculator

Asphalt formula to find the cubic footage of asphalt for any project is: ( T h e l e n g t h i n f e e t) x ( t h e w i d t h i n f e e t) x ( t h e d e p t h i n f e e t) However, an asphalt calculator will automatically tell you the estimated amount of asphalt needed to complete a project.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Calculator | EZ Street Cold Asphalt

Find a Local Sales Representative. Or Call Toll Free 1-800-734-1476

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Calculations & Conversions :: scruggscompany

Sand = 2,700 LBS per Cubic Yard. Concrete = 150 LBS per Cubic Foot. Limerock/Granite GAB = 105 LBS per Inch per Square Yard. Asphalt = 110 LBS per Inch per SY. 1 Inch of Asphalt = 110 LBS / SY. 1.5 Inches of Asphalt = 165 LBS / SY. 2.0 Inches of Asphalt = 220 LBS / SY. Examples:

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

5.10.4. CALCULATIONS FOR THE MARSHALL MIX DESIGN OF ...

Calculate the percent air voids in the compacted mixture. (Pa) 2.11. Calculate the percent voids filled with asphalt in the compacted mixture. (VFA) 2.12. Calculate the limiting asphalt content at the tentative design asphalt content. (P'b max) 2.13. Calculate the Bearing Capacity for each asphalt content. 3. …

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

AGGREGATE CALCULATOR [How Much Aggregate Do I Need ...

Asphalt calculator Cubic feet calculator Landscape calculator Gravel calculator . by James Quarrington . ... Aggregate calculator formula. The calculator first works out the area and volume of the space using the measurements you provide. In addition, it calculates the total weight if you know the density of the crushed material. ...

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

A.E.N. Asphalt, INC.

Our asphalt calculator determines roughly how much asphalt you will need for your job. This mathematical formula is great and easy to use. Just plug in your length and width and thickness and hit calculate. And your tonnage will appear in front of you. A.E.N. Asphalt, inc.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphalt Tonnage Calculator - American Asphalt Company

This calculator will estimate the number of tons of asphalt/hot mix that will be required. This estimate is based on a density for the mix of 150 lbs per cubic foot. Please note that densities will vary somewhat between different mixes, but this value is a standard "rule of thumb" for estimating.

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

American Asphalt Paving Co - Calculator - Asphalt

This calculator will estimate the number of tons of asphalt/hot mix that will be required. This estimate is based on a density for the mix of 150 lbs per cubic foot. Please note that densities will vary somewhat between different mixes, but this value is a standard "rule of thumb" for estimating. Length (feet)

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

The Official Web Site for The State of New Jersey

asphalt price adjustment - english asphalt price adjustment - item # 160007m if combined weight of bituminous materials is over 1,000 tons then calculate the following accordingly qty in the unit items's unit qty converted to tons hma patch t hot mix asphalt pavement repair sy hot mix asphalt surface course hot mix asphalt intermediate course

كوبي اولیه برای مرحله خوب مخرب، regrinding، و به عنوان مرحله…

Asphlat Cost Price Adjustment

Calculating Asphalt Cost Price Adjustment ASPHALT OST PRI E ADJUSTMENT IS APPLI ALE TO ALL PROJE TS WITH HMA. This provision allows adjustments to be applied when the current cost of liquid asphalt exceeds +/- 5% of the Estimated base cost. This adjustment does not guarantee full compensation to the contractor, but does significantly reduce ...